What the HVAC installer needs from electrical
Heat-pump projects move faster when the electrical scope is reviewed alongside the HVAC proposal. The equipment schedule tells us what circuits and disconnects are needed; the home’s existing service tells us what can be supported.
Before work is scheduled
- Share the outdoor and indoor unit model numbers or the contractor's equipment sheet.
- Show the planned equipment locations and the existing panel.
- Confirm who handles the electrical permit, utility coordination, and inspection where required.
Seafield can review the capacity and route, coordinate with the HVAC installer, and give the homeowner one clear electrical scope. We recommend a service upgrade only when the review supports it.
If the HVAC contractor is still choosing equipment, send the proposed models before the electrical appointment. A change in equipment can change the electrical scope.
